Railway Station Novi Sad

Within the project “Reconstruction and modernization of the railway Belgrade-Novi Sad-Subotica-Granica sa
Hungary (Kelebija)”, Novi Sad-Subotica section, the reconstruction of the Novi railway station is also being carried out
USA. 102 steel platform canopies were made on five platforms of the railway station. It’s a canopy
designed as a steel structure, with a roof made of aluminum sheet and tempered glass.
Newly designed canopies are made in two types (single-column and double-column). Canopy shape
was designed in such a way that its shape resembles the tesserae roof of the central lobby of the railway station
station and with it forms a harmonious whole.
In addition to concrete infrastructural improvements, it contributes to the creation of a favorable environment for economic development
growth and development, such projects encourage a sense of community, create better conditions for all users and make
the city a more beautiful place to live.

  • INVESTORChina Civil Engineering Construction Corporation
  • LOCATIONNovi Sad
  • OBJECT TYPESteel construction of platform canopies
  • CONSTRUCTION DIMENSIONS816m
  • WEIGHT OF CONSTRUCTION1.500t
  • THE DURATION OF THE PROJECT12.2021 -
  • CATEGORY

T. +381(0)21/847-290 office@celikdoo.rs

PRATITE NAS

Copyright Čelik doo - Bački Jarak, Srbia© 2016. All rights reserved.

TOP